With the Resolution of the General Directorate of Water, published in the BOE dated January 24, 2020, the opening of the public consultation period of the "Provisional Scheme of Important Issues of the Segura River Basin District" with a term of 6 months for the presentation of the corresponding contributions.
Later with the announcement of the General Water Directorate, published in the BOE dated June 4, 2020, extended the public consultation period until October 30, 2020.
During this time the following contributions have been received: